Hydro-Blast Plant Cleaning and Waste Hauling
Taplin Group was contracted to provide hydro-blasting cleaning services to a chemical manufacturing plant in South Haven, MI. Taplin crews efficiently pumped the 360,000-gallon digester and filter pressed solids. The digester walls and floor were hydro-blasted for inspection and repairs. Crews then provided transport and disposal of the filter cake and waste materials. Once the digester was finished, crews moved on to cleaning one of the plants 600,000-gallon single batch reactors that is also part of the waste treatment system. The reactor was in need of inspection and repair that would have been impossible without the initial cleanout provided by Taplin.